Atura picks Cummins electrolyser for 20 MW Niagara hydrogen plant
Atura Power has selected Cummins Inc. to build the electrolyser for its Niagara Hydrogen Centre – the first 20 MW hydrogen facility to be built in Ontario.
Atura Power has selected Cummins Inc. to build the electrolyser for its Niagara Hydrogen Centre – the first 20 MW hydrogen facility to be built in Ontario.
Klean Industries Inc. has signed a partnership with H2 Core Systems GmbH to build and distribute containerized hydrogen production facilities – the first of which will be at Klean’s Boardman, Ore. facility which processes 60,000 metric tonnes of passenger vehicle tires per year.